SERVICES / TECHNICAL OVERVIEW

Drilling works
to your specification.

We select the drilling method and equipment according to the purpose of the borehole, the design documentation and site conditions.

01 /

Site investigation drilling and sampling

Site investigation drilling reveals the layers beneath the surface. Coring, sampling and field testing provide data for specialist analysis and engineering design.

Sampled rock cores in boxes on site
From our own archive / 01

SCOPE OF WORK

  • Geotechnical investigation drilling with coring and soil and rock sampling
  • Mineral exploration drilling for quarries and extraction sites
  • Hydrogeological investigation drilling to identify aquifers
  • Field geotechnical testing, including SPT
  • Construction and installation of piezometers for groundwater monitoring
  • Borehole cleaning and development using airlift
  • Borehole yield testing

The scope of investigation and testing methods are determined by the purpose of the project and the designer’s requirements.

Send an enquiry
02 /

Boreholes for heat pumps

We drill and install vertical ground heat exchangers for ground-source heat pumps. For groundwater-based systems, we drill wells to the project specifications.

Yellow drilling rig and field crew
From our own archive / 02

SCOPE OF WORK

  • Drilling for vertical ground heat exchangers
  • Installation of ground heat exchangers to the design specification
  • Well drilling for groundwater-based systems

The number and depth of boreholes are determined by the system design.

Send an enquiry
03 /

Water well drilling

We construct drilled water wells for groundwater abstraction, for example for irrigation. The depth, diameter and construction are tailored to the geological conditions and intended use.

Water beside the drilling rig during well construction
From our own archive / 03

SCOPE OF WORK

  • Drilling to suit soil and rock conditions
  • Installation of suitable casing and well screens where required
  • Well cleaning and development using compressed air
  • Water yield testing to the agreed scope
  • Construction in accordance with the design documentation

Water yield cannot be reliably determined from borehole depth alone. Water intended for drinking requires appropriate quality testing.

Send an enquiry
04 /

Anchoring and foundation drilling

We undertake selected anchoring works and drilling for micropiles and steel sections, within the capabilities of our drilling equipment. Feasibility is assessed for each individual project.

Drilling rig beside an exposed rock face
From our own archive / 04

SCOPE OF WORK

  • Selected anchoring works
  • Drilling for micropiles and steel sections
  • Adapting the method to the design, ground conditions and available equipment

The technical scope and feasibility are agreed on the basis of the design documentation and site conditions.

Send an enquiry

05BEFORE WE ARRIVE ON SITE

Information for
planning the work

01

Location and purpose

Address, type of project and access for equipment.

02

Design requirements

Design documentation or an investigation programme, and the required scope of work.

03

Planning the work

Equipment, site layout and the proposed schedule.